Universal Waterproof Agent, consisting of high quality cement and sand and very active polymer. Mixing the powder with additive, brushing the mixture on substrate, permeate into the interior of the concrete and form crystal, stopping water anywhere.
Suitable for waterproofing of kitchen, washing room, pool, outwall, basement, underground parking, tunnel, etc.
Product Description:
1. Has unique penetrating function.
2. Can be used to wet the base plane, plane and elevation and back surface of the waterproof construction.
3. Has good two-way cohesiveness.
4. The waterproof layer doesn't need the protective layer.
5. Cement-based product has anti-aging, good weather resistance function.
6. Construction is simple.
7. It is environmental product, no-toxic, no smell, no radiation.
Scope of application:
1. Indoor and outdoor plane and elevation of concrete structure, bottom surface cementing, brick wall, light brick and other institutions.
2. Be suitable for basement, parking place, swimming pool, water pool, kitchen, bathroom, and balcony and so on.
3. It can be used for wall repairing, tile fracture, and large-scale renovation waterproof.
Treatment of base plane:
1. Base plane must be firm, smooth, and free of dust, grease, release agents, batik materials and so on.
2. All the small gaps and trachoma can be filled by paste which is mixed with powder with a small amount of water.
3. The exterior and internal angle should be fillet.
4. Leakage phenomena should be disposed firstly, and then start further waterproofing.
5. Base plane should be pre-wet, and be constructed after no clear water. That the construction could be faster, smoother; Construction efficiency could be improved, material costs could be saved.
Construction technology:
1. Mix 25g powders with 7~8kg water for brushing; Firstly pour water into one container, and add slowly powder depending on the proportion, stirring until no code and even paste. Standing for 5 minutes then stir again could get better effect.
2. Using brush crossways more than 2 directions by roller or brush; Depending on the standards of waterproof, base material and so on. The second time of construction should be done after 2 hours of the first one, it is the best time when the first layer not completely dry, or non-stick hand.
3. If it takes too long to dry the first layer, the construction should start after wetting the base plane and without clear water.
4. Keep stirring intermittently to prevent precipitation.
Within 24 hours of completion of the construction, should to prevent human trampling. When it is hot and dry, increase water curing in order to improve cohesion strength and waterproof effects.
Attentions:
1. Well-mixed sizing agent should be used within 2 hours, if it comes dry don't add water and reuse.
2. Construction should be done from 5~40, cannot be done under 0 or rain.
3. Provide ventilation installation when construct in poorly ventilated or enclosed environment.
4. The construction should start after the base plane is wet and without clear water, which can greatly improve waterproof effect; If it takes long time between 2 times constructions that should start after wet.
Store Method:
Store in cool and dry place, unopened product can be saved for one year.
Packing:
25kg powder+9kg additive/set
Usage kg/m² /mm:
1.5~1.7
Technical parameters:
compressive strength (MPa) |
≥18.0(Result=40) |
anti-breaking strength (MPa) |
≥6.0 (Result=10.2) |
impermeability (MPa) |
≥1.5 |
7d/28d cohesive strength (MPa) |
≥0.8/1.0 (Result=0.95/1.4) |
7d/28d penetration pressure(MPa) |
≥0.8/1.5 (Result=1.1/1.5) |
Alkali resistance |
No split, no peel off |
Heat resistance |
No split, no peel off |
Freezing resistance |
No split, no peel off |
Contractibility % |
≤0.30 (Result=0.25) |